Skip to content
1 min left · finish 3:54 PM
Email
I
Aurora Current
Illini CurrentAurora: City of Lights, Fox River revival
Good morning, Columbus⛅54°F · Cloudy

Advertisement · Why this ad?

  1. Home
  2. /Government
  3. /Traffic shift, lane closures start this weekend on I-88 in Aurora
Government

Traffic shift, lane closures start this weekend on I-88 in Aurora

James Holloway
James Holloway
James Holloway
Senior Reporter · Aurora, IL

A graduate of the University of Illinois at Urbana-Champaign, James Holloway brings a decade of experience covering local government issues, including stints with the Daily Herald and NPR Illinois. His insights into public policy and governance make him a go-to source for understanding the intricacies of local administration.

More from James →
Senior Reporter · Saturday, October 31, 2026 at 12:02 PM · 1 min read
Text size
Typeface
Line spacing
Theme
Focus mode
Email
Traffic shift, lane closures start this weekend on I-88 in Aurora — Aurora Government news

Long-term shoulder closures and traffic shifts start this weekend and are scheduled through November on the Canadian National Railway Bridge over I-88 in Aurora. Repair work will continue into 2027 with more traffic shifts needed to complete the work, according to a news release from the Illinois Tollway Thursday. This weekend, overnight lane closures on I-88 are scheduled in both directions between Eola Road and Route 59 for rumble strip removal and to prepare for a traffic shift. After the work is finished, eastbound I-88 traffic will be shifted for road work in preparation for bridge repairs. Additional traffic shifts will be scheduled throughout the winter to accommodate construction of temporary pavement, lighting and barrier walls, and build crossover pavement ahead of a future counterflow configuration needed for bridge repair work. The bridge repairs will consist of bridge beam removal and replacement after the Canadian National Railway Bridge over I-88 was hit by a vehicle, ac

Up nextYorkville delays water rate hikes 2 more months; Lake Michigan project back to original $300M estimate Government · 1 min read
#development#weather

More Government stories

Yorkville delays water rate hikes 2 more months; Lake Michigan project back to original $300M estimate  — Shaw Local News Network
Government

Yorkville delays water rate hikes 2 more months; Lake Michigan project back to original $300M estimate

By James Holloway

I-88 overnight ramp closures scheduled through November — Shaw Local News Network
Community

I-88 overnight ramp closures scheduled through November

By Luis Martinez

Overnight ramp, interchange closures on I-355 scheduled through fall — Shaw Local News Network
Community

Overnight ramp, interchange closures on I-355 scheduled through fall

By Luis Martinez

The sweet life: Stings don’t deter interest in beekeeping — Shaw Local News Network
Schools

The sweet life: Stings don’t deter interest in beekeeping

By Tommy Nguyen

Also covering Illinois

JolietBloomingtonSpringfieldPeoriaChampaign
I

Aurora Current

Part of the Illini Current Network

Aurora: City of Lights, Fox River revival. Hyper-local community news covering 40 Illinois cities.

Sections

CommunityBusinessArtsSchoolsGovernmentSports

Latest Stories

How the law protecting Americans from surprise medical bills is driving up healthcare costsIVCC opens registration for Spring 2027 classesMan killed after argument leads to shooting inside Northwest Side home15-year-old critically injured in double shooting on Chicago's South SideDOJ pushes to isolate Alaska ballots in Peltola probe

About

Illini Current publishes independent community news across Illinois. Local reporters. Non-partisan. Community-first.

RSS FeedNetwork Directory

© 2026 Illini Current — illinicurrent.com

PrivacyTerms

A product of Edina Automation LLC

You're offline — showing the last loaded page
HomeSearchSaved